The LIFE Home team was able to get inside the rapidly-developing LIFE Home once again to begin to think about final construction needs and begin to plan for the completed LIFE Home. In this trip, the team noted furniture needs and began to think of the flow of the space from both a research participant perspective as well as a researcher/community member perspective.
With the walls up, the electrical installed and functional, and the space beginning to take shape, it is only a matter of time until the space is complete from a construction standpoint and the furniture is begins to be installed!